Upcoming molds......... (18 Viewers)

I know we could never get a count of how many civilians outside of PCF have CPC orders placed but maybe we could start taking a role call of what molds PCF members have and how long they have been waiting to give people an idea. Might help when someone is looking to place an order. Knowing if they could get in on something about to run could be helpful.

I have a B Diamond order and have been waiting for just over 3 months.
 
2 different sets.
HHR initially purchased in May '21.
FDL initially purchased in September '21.
*still doing a last minute add on although I think the window is closing rapidly.

Both worth waiting for each and every day.
 
Last edited:
This is really good timing for you
Yes, other than if I would have gotten the bug a little earlier I might have saved a little dough with 2021 prices…lol. I started off coming here just to research and try to find a cash set of casino chips to buy. The more I saw what some of you guys have done with these customs, the more impressed I was and I said what the hell I might as well go full Monty on it. I grew up in NOLA so the FDL would have always been part of my design no matter what. Emailed CPC to ask when they were likely to run and was told 4-6 months so I got my money in. Now I just need to finish the design. Here is a prototype.
 

Attachments

  • 283C00A5-97C8-48C4-90E2-33515929E865.jpeg
    283C00A5-97C8-48C4-90E2-33515929E865.jpeg
    65.6 KB · Views: 128
Yes, other than if I would have gotten the bug a little earlier I might have saved a little dough with 2021 prices…lol. I started off coming here just to research and try to find a cash set of casino chips to buy. The more I saw what some of you guys have done with these customs, the more impressed I was and I said what the hell I might as well go full Monty on it. I grew up in NOLA so the FDL would have always been part of my design no matter what. Emailed CPC to ask when they were likely to run and was told 4-6 months so I got my money in. Now I just need to finish the design. Here is a prototype.
Looks awesome. Can’t wait to see it completed
 
Looks awesome. Can’t wait to see it completed
Thanks, we are shooting for a combined Saints/Mardi Gras coloring theme in the set. This is one of the MG colored chips. Also trying to tie them into my table felt (which looks like my avatar).
 
CSQ Rounders semi custom paid for 1/4/22.

I’m seeing some HHR and FDL being shipped. Does that mean I missed the window? I was told 50/50 at the time I ordered.

Should I continue to hold hope, or should I box up my stock chips for 8-12 months?
 
Disgruntled rant: for what CPC chips cost I think posting a schedule of molds on their vendor forum thread should be a no brainer. This thread gives me so much anxiety and it would just be good to know the definitive schedule even if it’s disclaimered all to hell. It wouldn’t even need dates, just something that says “current molds in operations”, followed by the next x number of molds to go in after, perhaps 4-6 molds out or something.

I love seeing everyone’s sets but coming here after a year of waiting to see others get their sets after single months, weeks, or even days stings a bit lol. I feel like the above approach would also save CPC from getting a bunch of emails about when certain molds were expected to run.

Ok I’m done, sorry!
 
Disgruntled rant: for what CPC chips cost I think posting a schedule of molds on their vendor forum thread should be a no brainer. This thread gives me so much anxiety and it would just be good to know the definitive schedule even if it’s disclaimered all to hell. It wouldn’t even need dates, just something that says “current molds in operations”, followed by the next x number of molds to go in after, perhaps 4-6 molds out or something.

I love seeing everyone’s sets but coming here after a year of waiting to see others get their sets after single months, weeks, or even days stings a bit lol. I feel like the above approach would also save CPC from getting a bunch of emails about when certain molds were expected to run.

Ok I’m done, sorry!
Meh. While I understand your side I'd like to point out that David and Co. Are pretty busy. He has much more than just this going on. And this was already a handful long before Covid hit. Compounded by that, it's probably a nightmare. He's doing a pretty good job of balancing everything and as anyone who has ordered with him will attest, no order is straightforward. Changes, delays, re-runs, errors, are all very time consuming. And his tolerances and quality are of the highest standards. To be honest, I'm 99% positive that his uptime schedule changes pretty frequently. As such, I think it would be more frustrating for members here to keep up with all the changes. And at the end of the day not have to deal with the belly aching and fallout of those changes. It's just easier to let the finished products speak for themselves when they hit doorsteps.
 
Disgruntled rant: for what CPC chips cost I think posting a schedule of molds on their vendor forum thread should be a no brainer. This thread gives me so much anxiety and it would just be good to know the definitive schedule even if it’s disclaimered all to hell. It wouldn’t even need dates, just something that says “current molds in operations”, followed by the next x number of molds to go in after, perhaps 4-6 molds out or something.

I love seeing everyone’s sets but coming here after a year of waiting to see others get their sets after single months, weeks, or even days stings a bit lol. I feel like the above approach would also save CPC from getting a bunch of emails about when certain molds were expected to run.

Ok I’m done, sorry!
I really don’t think people are putting custom orders in and getting them back in days or weeks. Or even a single month. I think you may have misunderstood some comments on here.

And even though you correctly point out that these are really expensive, I don’t believe this is an especially lucrative business. Does it make money? I certainly hope so because I want them to stay in business. They are literally one of a kind. It’s a really small business. They do what they do the way they do it. To me you have to sort of be ok with it or…….not.
Plus David is super responsive. Just email him with questions. He’s in the UK of course, so keep that in mind. Hope you get your chips soon. Can’t wait to see them:)
 
CSQ Rounders semi custom paid for 1/4/22.

I’m seeing some HHR and FDL being shipped. Does that mean I missed the window? I was told 50/50 at the time I ordered.

Should I continue to hold hope, or should I box up my stock chips for 8-12 months?

I ordered two CSQ sets in mid 2021. One has arrived and the other has not yet. The run is still live.
 
I ordered two CSQ sets in mid 2021. One has arrived and the other has not yet. The run is still live.
Thank you for the info and perspective! As a first time orderer, there are a lot of unknowns, which I’m sure will be cleared up once I’ve been through the whole process.

I’m far from frustrated, just excitedly naive :ROFL: :ROFLMAO::ROFL: :ROFLMAO:
 

Create an account or login to comment

You must be a member in order to leave a comment

Create account

Create an account and join our community. It's easy!

Log in

Already have an account? Log in here.

Back
Top Bottom