I got a lot of help from this forum on redoing mine so I wanted to spread the wealth on those who have the ESPN table.
Tips:
The only difference is there is a layer of plyboard underneath the arm rests, but this affects how you will build it.
Bring the foam padding under the plywood that the front quarter rests on it. this will give it a slight slant upwards which will create a deeper ring affect, and will also allow you to use LED's still.
If you are drilling out cup holders, do not go bigger than 2.75", otherwise you will eat through the entire LED plywood sheet. Because of this extra depth you also do not need to cut the legs of the table unless your cup depth is over 2.5"
You should absolutely replace the foam under the felt. IT IS GARBAGE. since you'll already have most of the work done, spend the extra $30 and get some good foam. I used elmers adhesive spray because I already had it, otherwise i'd use 3M. Elmers worked fine for me.
Replace the LED's. We all know that the ones they originally use are too bright, and the inability to change the color is annoying.
https://www.amazon.com/gp/product/B08JH5M6N3/ref=ppx_yo_dt_b_asin_title_o00_s00?ie=UTF8&th=1
That is what I used and they look great for the price!
Total cost:
$136 for new speed cloth and foam from TPS
$30 set of 10 2.75" diameter, 2.5" depth cup drop ins.
$16 multicolored LED's
$22 for clamps and hole cutter (I already had the rest of the tools)
I am generally a handy guy, but have little woodworking experience. From start to finish it took me about 8 hours.
Pics
View attachment 815575View attachment 815577View attachment 815578View attachment 815580